完善简历 我要招聘 登录/注册


船员英语|锚令 Anchoring orders

作者:船员帮
类型:船员资讯
布于:2024-07-11 16:16:11
关注微信公众号


1.准备抛

Stand by port anchor 准备抛左锚 

Stand by starboard  anchor 准备抛右锚

Stand by both anchors 准备抛双锚

词组 &单词

Stand by[stænd] [baɪ] 准备

port [pɔrt] 左舷,左侧

starboard [stɑrˌbord] 右舷,右侧

anchor ['æŋkɚ]  n.锚 v.抛锚

both [boθ] 双方,两者

【 船员帮Pro 】 船员求职、公司招聘


2.抛锚

 Let go starboard anchor 抛右锚

之后,如果锚爪已抓住海底,大副在船头需要向驾驶台报告:

Anchor brought up 锚已抓底

驾驶台回复:ok/roger/copy that

对话:

A: Is the anchor ready for letting go?

准备好抛锚了吗?

B: Port anchor ready for letting go . The anchor is just above the water.锚已备好,锚刚好在水面以上。

A: Let go port anchor.抛左锚

B: Let go port anchor.(复诵)  Port anchor let go.(报告)


 海事局真题免费做, 模拟考试点这里!

e船员易船员,赞20

3.锚链入水

...shackles in the water 放...节锚链入水

shackle['ʃækl] 锚链节


4.起/5.绞/6.刹住/7.停止

4. stand by to heave up 准备起锚 

词组:heave up [hiv] [ʌp] 用力抬高 

5. heave up both anchors 绞起双锚

6. hold on both cables 刹住双锚链

7. Stop /Avast heaving 停止绞锚

Avast[ə'væst] 停住

当锚头离开海底,不再受力

大副应向驾驶台报告:

Anchor is aweigh 锚离底

驾驶台回复:ok/roger/copy that

8.锚链方向

How is the chain leading?

锚链方向是什么?

lead [lid] 导向,领导

下表中anchor/port anchor/starboard anchor/both anchors可根据情况替换使用

口令 orders报告 report

Stand by anchor准备抛锚

Anchor stand by 锚已备好
Let go anchor 抛锚Anchor let go锚已抛出

6 shackles in the water

6节锚链入水

6 shackles in the water  

6节锚链已入水

Stand by to heave up准备起锚

stand by to heave up准备好起锚

Heave up anchor 绞起锚

Heave up anchor 已绞起锚

Hold on both cables刹住双锚链

Hold on both cables已刹住双锚链

Stop /Avast heaving 停止绞锚Stop /Avast heaving 停止绞锚

How is the chain leading?

锚链方向是什么?

up and down 垂直

leading ahead 向前

leading aft 向后

leading to port向左

leading to starborad向右

leading round the bow过船头

leading 3 o' clock 向右正横

图片

e船员易船员,赞49

9.锚链状态


1) Anchor is aweigh 锚离底

aweigh  [ə'we] adj. 刚离开水底的

2) Anchor is sighted 锚可见

sight  [saɪt] n.视力 v.看见  

sighted ['saɪtɪd] adj. 看得见的

3)Anchor is clear 锚清爽

clear  [klɪr] adj. 清楚的;清澈的;

4)Anchor is up 锚出水

up [ʌp] adv. 向上,在上面;

5) Anchor brought up 锚已抓底

6)Anchor is foul 锚绞缠

foul [faʊl]  adj. 犯规的;污秽的;v.犯规,弄脏,缠住

foul water污水;foul play不公平的比赛

船舶英语中,用于形容锚链绞缠。

如锚链的绞缠 foul cable 

cable ['kebl]原意 缆绳,电缆,在船舶英语中指锚链


锚链受力情况

How much weight is on the cable? 锚链的受力情况? 

Much weight on  cable.锚链吃力

Too much weight on cable. 锚链非常吃力

No weight on cable 锚链不吃力

Medium weight 中等受力

Chain is tight 锚链吃力

[tʃen] [ɪz][taɪt]

tight adj. 紧的;adv. 紧紧地;彻底地

对话:

A:How is the cable leading ?锚链的方向如何? 

B:Cable is leading forward.Medium weight.

锚链向前,中等受力

Five shackles in water.五节入水


新闻资讯
全球第二大集装箱港严重拥堵,船舶最多延误7天……
目前,大量船舶在新加坡港外排队等候靠泊,排队的运力已超过45万TEU。近期,全球多个港口面临拥堵、船期延误的问题,其中亚洲港口尤为突出。亚洲集装箱咨询公司Linerlytica的最新报告显示,全球第二大集装箱港——新加坡港的集装箱船拥堵状况,已达到严重水平。Linerlytica称,近期,大量集装箱船在新加坡港外排队等候靠泊,排队的运力已超过45万TEU。按照Linerlytic的估算,这些船舶的等待时间最长将达到7天。严重的拥堵已迫使部分船公司取消原定在新加坡港的停靠计划,这意味着其他港口将不得不处理更多的货物,这也加剧了供应链的紧张态势。Linerlytica预计,未来一个月,港口拥堵情况将进一步恶化。澳大利亚Visy公司也在一份分析报告中表示,除新加坡港外,巴生等其他亚洲港口的船舶延误时间,也已达到3~6天。此前不久,一家迪拜船公司的负责人曾透露,港口拥堵和船期延误已从东亚、东南亚地区延伸到中东地区,多个中东港口都出现了延误。其中,杰贝阿里港的延误时间为3~4天,达曼港4~6天,吉达港已达到惊人的12天。行业分析机构Xeneta首席分析师Peter Sand预测,港口拥堵和船期延误可能很难在短期内解决,因为红海危机更加复杂,对航运业的影响仍将持续,并且没有缓解的迹象。
船员帮 2024-05-31
我是中远集团一名山东海员的妻子!
我爱人是中远海运船员深圳分公司的一名船员,由于工作的关系,他的工作场所在船舶,会长时间航行于大海之上,社会上许多人对他们并不了解,多半会说,他们收入高,能去世界各地旅游,休假时间长,这工作很好啊!但是这也是很片面的看法,作为一名海嫂,我想通过自己的家庭小事,向大家讲一讲我们船员家庭的快乐事,让大家更深地了解船员之家! 我的家乡在山东省聊城市,远离大海,对大海认知微乎其微,但我从小就喜欢大海的美丽、宽阔与深邃。正因如此,2008年我有缘遇到了我的爱人,从此便与海结缘,在与他相爱相伴的日子里,我看到了航海人有着一颗比大海还宽阔的心。因为工作关系,他不能经常在家,但他给我和儿子的爱,就像大海潮汐,时时包围着我们这个幸福的小家庭。想想当年,通讯不发达,我与爱人只能单向联系,心中的话语只能每日写于纸张,用书信互赠寄托。记得订婚后他上远洋船做三副,过了两个多月才联系上,因为船员有事才能打卫星电话,而且费用昂贵,所以每次也就只打几分钟;之后有了铱星电话,基本一周能通话一次;后来,通讯条件有了很大改善,船舶的家信系统可以每天邮件联系;现在,船舶普及了无线网络,可以通过QQ和微信跟家人联系,十分方便。现在无论他航行在哪片海域,无论靠泊于哪个国家的港口,我每天都能收到他的信息,让我时时感受到来自远方的一份关爱与呵护!我爱人现在是一名船舶大副,已经考取船长证书,我总喜欢称呼他“未来的船长”。大副是船长的主要助手,是船舶甲板部的部门长,工作量相当繁重,但他在信中从不跟我提及,因为他不想让我在家为他“操心”。这份简单的爱,对于一个双双在陆地工作的家庭来说,也许并不起眼,但对于我们船员家庭来说,却显得尤为重要。要知道,远航在外的亲人,谁不牵挂?谁不爱怜?只有做了海嫂,才会有与平常人不同的思念与牵挂。作为一名海嫂,我一直很支持爱人的工作。他从一名实习生做起,升职到三副、二副、大副,这一路走来,他为航海梦追逐,那我就愿意和他一起圆梦。但是这期间,我也深感作为一名海嫂的不易,儿子出生时,爱人刚上船3个月,等他休假回家儿子已经7个月大了,这期间也是我最煎熬的一段时光,现在儿子都上小学三年级了,回想起来,还有一丝丝鼻酸。尽管聚少离多是我们生活的常态,但酸甜苦辣自有一番滋味。在他远航的日子里,家里所有的一切大小事务,需要我像男人一样全面担当起来。为了让爱人安心在船工作,我会在信中“报喜不报忧”。结婚前不怎么做饭的我,也能做出一桌子的饭菜;孩子半夜发烧,我从开始的茫然不知所措,到现在的沉着应对,那是经历了多少次才积累下的经验啊!我想正是因为有了心中对爱人的的那份爱与坚守,人也变得无比坚强起来。每逢佳节倍思亲。爱人曾经连续5个春节没在家过。对此他从不计较,服从公司安排,我心中也能理解,说实话,节前上船工作,节后才能回家,作为妻子,心中当然不情愿,但站在他的角度去想,心中就会平衡许多,我离开的是他一个人,而他离开的却是所有的亲人。虽然,内心也有失落之处,但我会把这份失落轻轻收起,放在心灵不会触及的地方,让她慢慢生根,等待下一个相聚的日子,开出一丛更为灿烂的花朵。因为我相信,只有真心相爱的人,心灵是永远相通的。在看尽潮起潮落,斗转星移,感叹时光飞逝的同时,想想我与爱人相识的十年,我从未后悔当初对婚姻的选择,希望我们的下一个十年,能够碰撞出精彩别样的火花!
船员帮 2023-03-03
“史上最大”,3艘豪华邮轮敲定!全球最大邮轮公司嘉年华集团
随着邮轮市场持续复苏、邮轮旅游业热度走高,邮轮新造船市场随之迎来一次小规模“订单潮”。全球最大邮轮公司嘉年华集团7月23日在官网宣布,该集团已与全球最大造船集团之一意大利芬坎蒂尼(Fincantieri)达成协议,将为旗下同名邮轮品牌嘉年华邮轮(Carnival Cruise)设计和建造3艘液化天然气(LNG)动力豪华邮轮,预计分别将于2029年、2031年和2033年夏季交付。同日(7月23日),嘉年华集团3艘豪华邮轮造船协议在Fincantieri官网得到证实。嘉年华邮轮将在未来公布3艘新船的更多设计细节和航线信息。该订单取决于融资情况,预计融资将于今年晚些时候完成。该型邮轮总吨位约为230000,将成为嘉年华集团全球船队中的最大邮轮,同时也是Fincantieri和意大利造船厂有史以来建造的最大船舶;新船配备3000多间客舱,满载情况下可容纳近8000名乘客,可以使用LNG燃料;将采用先进的能源效率、废物管理和减排技术,以进一步减少环境足迹。在2033年全部完工交付后,嘉年华集团将拥有16艘LNG动力邮轮,其中8艘由嘉年华邮轮运营,占嘉年华集团全球船队运力的近30%,并可立即减少温室气体排放。Fincantieri表示,该集团迄今为止共计向嘉年华集团旗下品牌组合交付75艘邮轮,其中向嘉年华邮轮累计交付15艘邮轮。嘉年华集团指出,上述3艘新建豪华邮轮将使该集团在2025年至2033年期间的总体运力增长达到平均每年约1.5%。同时,嘉年华集团已于最近宣布一系列战略转移计划,以进一步优化其全球品牌组合的构成并增加嘉年华邮轮的载客量,在2023年至2025年3月期间,共有5艘邮轮从姊妹品牌转入嘉年华邮轮船队。对此,嘉年华集团首席执行官Josh Weinstein表示:“作为回报率最高的品牌,嘉年华集团正在加快推进嘉年华邮轮的进一步发展,以满足对全球最受欢迎的邮轮航线持续增长的强劲需求。目前,嘉年华集团仅在2025年、2027年、2028年、2029年、2031年和2033年各交付1艘新船,集团将继续采取严谨的增长方式,以每年一到两艘新船的速度,战略性地将新运力投放到需求量最大的地区。”加上最新签订的造船协议,嘉年华集团今年已宣布5艘新船订单,全部将加入嘉年华邮轮船队,另外2艘由德国造船商Meyer Werft承揽。今年2月,嘉年华集团向Meyer Werft下单1艘Excel级LNG动力邮轮,这是嘉年华集团时隔五年来首份新造船合同,预计2027年交付;3月26日,再次向Meyer Werft增订1艘Excel级LNG动力邮轮,预计2028年交付。市场反弹,邮轮造船商迎来小规模“订单潮”随着疫情过后邮轮预订量强劲反弹,嘉年华集团、皇家加勒比集团等全球邮轮公司相继重返新造船市场,加快推进新造船计划,以满足逐渐回暖的市场需求,全球主要邮轮造船商的订单量也有所增加。Fincantieri、Meyer Werft以及法国大西洋船厂(Chantiers de l’Atlantique)等均获得造船合同。Fincantieri今年已宣布多型多艘邮轮订单,分别来自挪威邮轮控股公司、瑞士邮轮公司维京邮轮(Viking cruise)、水晶邮轮(Crystal)以及嘉年华集团(即上述3艘最新公布的邮轮订单)。4月8日,Fincantieri与挪威邮轮控股公司签订重要协议,负责为旗下三大邮轮品牌丽晶七海邮轮、大洋洲邮轮以及诺唯真邮轮设计和建造3型8艘大型邮轮,其中丽晶七海邮轮(2艘)和大洋洲邮轮(2艘)的造船合同已获融资担保,现已生效;诺唯真邮轮(4艘)已签订建造意向书,将在获得融资担保和满足其他条款/条件后生效;6月21日,与维京邮轮签订2艘邮轮订单,预计将于2028年和2029年交付;6月27日,与水晶邮轮签订2+1艘高端邮轮协议备忘录(MoA),首艘邮轮预计将于2028年春季交付。今年以来,Meyer Werft共获得3份邮轮订单,除上述提及嘉年华集团的2艘Excel级LNG动力邮轮外,该造船商已于7月9日获得日本休闲旅游公司Oriental Land Company的1艘迪士尼Wish级邮轮订单,预计将于2028年交付。该型邮轮总吨位约140000,配备1250间客舱,可容纳约4000名乘客和约1500名船员。法国大西洋船厂的订单来自皇家加勒比集团,负责为其建造1艘绿洲级(Oasis Class)邮轮,预计将于2028年交付。此外,美国邮轮公司(American Cruise Lines)已经向美国切萨皮克船厂(Chesapeake Shipbuilding)订购3艘内河邮轮,预计将于2026年交付。根据中国船舶工业行业协会近日发布的《邮轮市场发展报告2024》,2023年邮轮旅游出游乘客3170万人次,达到2019年水平的107%,比2019年增加近200万人次。业界预计2024年将有3570万名邮轮乘客出航,全球邮轮运力预计将从2024年的67.7万个标准底层床位增长到2028年的74.5万个。相关数据表明,全球邮轮市场正逐渐走出几年前的阴影,邮轮造船商也将实现新的订单目标。
船员帮 2024-07-25
安通控股(600179)年报出炉,内贸箱量在83个港口位列前三 | 船员帮pro
3月27日晚,安通控股股份有限公司(简称“安通控股”,600179)发布2023年年度报告。报告显示,2023年,安通控股实现营收73.44亿元,归属于上市公司股东的净利润5.68亿元,归属于上市公司股东的扣非净利润3.26亿元,资产总额与归属于上市公司股东的所有者权益分别达到138.66亿元与101.62亿元。在内外贸集运市场均不景气的背景下,安通控股通过战略转型,实现了稳定盈利,资产稳步增长。在股东最关注的分红方面,因未满足上市公司分红相关条件,2023年安通控股拟不进行分红,但制定了未来三年分红回报规划,条件满足时,未来三年以现金方式累计分配的利润不少于最近三年实现的年均可分配利润的30%。截至2023年年底,安通控股旗下船舶共73艘,总运力达221.78万载重吨,其中自有船舶48艘,在Alphaliner全球班轮企业运力排行榜上排名第22位,位居内贸船公司前三。2023年,市场总体运输需求疲软,大量运力集中交付,部分运力回流内贸,内贸市场竞争加剧。据新华·泛亚内贸集装箱运价指数,2023年内贸集运市场综合运价指数均值为1262.2点,较2022年大幅下滑,当前运价水平为近五年来同期最低。同时外贸租船市场持续下行,内贸船公司的租船营利也大幅下降。不过2023年,安通控股完成计费箱量262.53万TEU,同比上升7.64%,且箱量上涨的同时,平均运价降幅低于市场综合运价降幅。2023年,安通控股在全国各港口集装箱总吞吐量超过1,370万TEU,在数十个内贸港口吞吐量排名前三。这份成绩是安通控股积极进行营销转型升级,深挖客户需求,加大项目客户开发,拓展新业务的成果。2023年,安通控股明确提出了从业务操作型向客户营销型的战略转变,从传统的坐商模式向行商模式迈进,同时进行了数字化与人力资源转型。2023年,安通控股完成华东、华南片区的网点整合,通过整合业务资源,构建了一个更加高效、协同紧密的口岸网络。截至2023年12月31日,安通控股在全国设立了51个海运网点,覆盖152个业务口岸。此外,安通控股上市运行首批新型干散货集装箱,针对内贸货种提升集装箱各项性能;全新改版的安通订舱网上线,深入洞悉并满足用户需求,提供更优质便捷的服务。在物流业降本增效和鼓励多式联运发展的政策指引下,2023年,安通控股新增了多条内贸航线与海铁联运班列,提供覆盖更广、班期更密、交货更快、效率更优的航线与多式联运产品。目前安通控股主营国内航线干线34条,基本覆盖国内主要干线港口;与全国近2,000家集卡运输供应商深度合作,整合码头、船舶、铁路、集卡多方资源,公路业务营收同比大增23.82%;设立铁路网点9个,涉及业务铁路站点235个,海铁线路143条,铁路服务覆盖31个省级行政区278个城市,铁路业务营收同比增长15.89%。在港航合作上,安通控股发挥控股股东优势(控股股东的招航物流合伙人中有招商局集团旗下的招商港口、辽港集团),与招商局集团旗下中国外运结成战略合作伙伴,共同发展国内外全方位的综合物流业务合作;并与汕头招商局港口开展港航联营,通过海铁联运打通出口欧洲的货物新通道。此外,安通控股还与上港集团合资成立了上海港罗东集装箱码头有限公司,该公司运营的罗泾自动化集装箱码头一期已于去年年底投运。凭借强力的股东背景,稳健的财务结构,多层次、广覆盖的物流网络,高效的运营与服务能力,安通控股的内贸集装箱吞吐量在国内83个主要港口位列前三,其作为内贸龙头企业的核心竞争力与品牌效应不言而喻,2023年,安通控股先后荣膺郑和航海风云榜“2022年最佳航运公司”与“2023中国物流企业50强”。港口圈(ID:gangkouquan)认为,船公司在过去几年尽享市场红利,但内卷的竞争格局没变,对内贸船公司来说,2024年充满挑战,需求增长疲软及运力过剩都可能造成内贸运价在低位徘徊,各家企业间的竞争将更为激烈,船公司必须顺势而动,寻找新的业务增长点。有几大趋势尤其值得注意:一是多式联运获得更多政策支持,利好构建大宗货物及集装箱中长距离运输以铁路和水路为主的发展格局;二是集装箱的大型化、特种化,将推动“散改集”,吸纳更多适箱货源;三是行业数字化提升和绿色低碳转型进程加速,成为集运企业转型的核心方向。对安通控股来说,2023年的各项举措已经走在了顺应行业格局、进行战略转型的道路上,新型干散货集装箱与全新的订舱网肉眼可见,优化的业务网络与业务伙伴的协同合作悄然发力,精准走在趋势之先。2024年,安通控股将继续增强信息化建设,实现业务一体化运作;巩固多式联运服务基础优势,塑造多式联运品牌;开辟后方市场,延伸航运产业链;延伸供应链金融,打造“物、贸、融”供应链生态圈,这是其实现一流的综合物流服务商愿景的最佳途径。
船员帮 2024-04-01
船员培训考试,船员实用英语口语,看完就能用!
1. Welcome aboard my ship. 欢迎光临我轮。 2. Here are all the Seaman’s Book and two copies of the Crew List. 这是全部的海员证和两份船员名单。 3. Will you please fill out the Application Form for shore passes? 请你填写登岸证申请表好吗? 4. When can we get the shore passes? 我们什么时候能得到登岸证呢? 5. Please collect all the shore passes and return them to me before  ship’s departure. 你轮离港前情把所有的登岸证收 齐并交回给我。 6. Shall we begin the Customs formalities now? 现在我们开始海关手续吗? 7. Here are the Import Cargo Manifest, the Crew’s list, the last  Port Clearance and Crew’s Effects Declaration. 这是进口载货单, 船员名单,上一港口出港许可证和船员个人物品申报单。 8. We have general cargo store. 我们只载一般货物。 9. This is our bonded store. 这是我们的保税物料间。 10. We Chinese seamen should observe the Customs regulations. 我们中国海员应该遵守海关规章。 11. I’ll take you to the Pilot’s cabin fist. 我先领你去引水员房间。 12. Please follow me. 请跟我来。 13. When can we enter the harbour? 我们什么时候能够进港? 14. Now, tell me the draft fore and aft, please. 现在请告诉我船的前后的吃水。 15. We have to wait here till the tide turns. 我们要在这里等到潮涨。 16. How long will it take us from here to the harbour. 从这里到港口需用多少时间? 17. Which berth shall we take? 我们使用哪个泊位? 18. What side will go alongside? 那边船舷靠岸? 19. How many lines are we to make fast ashore? 我们用几根缆绳岸上绑牢。 20. Is the ship in position now? 现在船到位了吗? 21. I’ll make out a stowage plan before loading. 我将在装货前制作好配载图。 22. All the holds are ready for loading. 全部货舱已准备好装。 23. According to the stowage plan, the heavy cargo must be stowed on the ceiling and the lighter cargo placed on the op. 根据配载图,重货堆装在舱底,轻货放在顶上。 24. The containers on deck must be securely lashed. 甲板上的集装箱必须绑牢。 25. Would you mind going with me to have a look at all the  holds  and make a record on the spot? 请你与我一起看看各货舱并作现场记录好吗? 26. When will you begin discharging? 你们什么时候开始卸? 27. How many shifts are there a day? 一天有几个班次? 28. How many gangs will you start with? 你们准备派几个工组 开工。 29. The safe working load of each derrick is five tons.每台吊货杆的安全负荷是五吨。 30. When do you expect to finish the discharge? 你们预期什么时候卸完货。 31. Why didn’t you report the matter to me when you found the  damaged cargoes? 当你发现残损货物时,你为什么不向我报告这件事? 32. There is too much difference between your figure and the  loading port tally figure. 你的数字和装货港的理货数字相差很大。 33. I think the stevedores’ damage is here too. 我想这里也有工残。 34. We’d better call the cargo surveyor aboard to ascertain the extent  of damage to the cargoes.我们还是叫商检员上船来确定残损货物的程度为好。 35. I believe your tally figure, but I believe the loading port tally figure,  too.我相信你的数字,但我也相信装货港的理货数字。 36. We need three hundred tons of fuel oil and two hundred tons of  diesel oil. 我们需要300吨燃料油和200吨柴油。 37. I hope your supplies are of high quality and not short of  weight. 我希望你们供应的油要高质量,不缺分量。 38. The larger oil line is six inches, for fuel oil and the smallr one is four  inches, for diesel oil. 大的油管6英寸,用于燃料油,小的油管4英寸,用于柴油。 39. Could you send your oil barge here tomorrow morning?  你能在明天上午派油驳船来吗? 40. Please pump fuel oil first and then diesel oil. 请先泵燃料油,再泵柴油。 41. I’d like to look round your warehouse before I decide  what to buy.      我要先看一看你们的货栈再决定买什么?42. The Chief Cook will go with me. 大厨师与我一起去。 43. I want to know how you sell them. 我要知道你们怎样卖。 44. Can’t you manage any cheaper? 你们能不能便宜一点卖吗? 45. Please send the vegetables on board straightaway. 请立 即把蔬菜送上船。 46. We are to leave the harbour as soon as the loading is completed. 我们在卸货后离港。 47. When can we get the Outward Clearance and sailing permit? 我们什么时候能得到出口结关证和开航许可证。 48. We are ready for your order to sail. 我们正等待你的开航命令。 49. The sailor on duty is hoisting the Blue Peter now.值班水手正在升起开航旗(P字旗)。50. Thank you for your cooperation, Pilot. 引水员先生,谢谢你的合作。
船员帮 2023-08-09
近期黄热病疫苗预防接种的通知--陕西国际旅行卫生保健中心
根据《国际卫生条例》规定和世界卫生组织有关要求,前往黄热病流行区需进行黄热病疫苗接种。接种黄热病疫苗后十天产生保护效力,建议提前做好安排,尽早进行疫苗接种。预约流程:进入公众号“陕西国际旅行卫生保健中心”,点击“预约”,选择“在线预约”,选择“黄热病疫苗接种预约”进行预约,预约时请认真阅读预约须知,按照预约时间前来接种。携带材料:1、本人身份证或护照原件;2、2张两寸白底彩色证件照(近6月内拍摄);3、18岁以下未成年人须有一名法定监护人陪同;4、前往世界卫生组织所公布的黄热病流行区国家的签证复印件1份(如有请提供);5、前往世界卫生组织所公布的黄热病流行区国家的机票复印件1份(如有请提供)。相关政策:具备以下条件之一可申请免费接种:1、持前往世卫组织公布的疫区国家或地区的签证和机票。2、因免签、过境免签、落地签证等入境签证政策无法提供签证的人员,须持前往世卫组织公布的疫区国家或地区的机票。3、持入境时海关出具的《黄热病预防控制告知书》以及本人有效的护照或其它入境证件,经评估符合接种条件的。其他自愿申请接种黄热病疫苗且不符合免费接种政策的接种者,我中心参照《中华人民共和国疫苗管理法》非免疫规划疫苗相关规定收取费用。接种地点:西安市含光北路10号此通知于2024年7月24日起执行。为您带来不便,敬请谅解,感谢您的配合。附件:世界卫生组织公布存在黄热病疫情风险的国家列表非洲29个安哥拉­­­­ ­赤道几内亚­­­­ ­毛里塔尼亚­­­­ ­贝宁­­­­ ­埃塞俄比亚­­­­ ­尼日尔­­­­ ­布基纳法索­­­ ­­加蓬­­­­ ­尼日利亚­­­ ­布隆迪­­­ ­冈比亚­­­­ ­­塞内加尔­­­­ ­­­喀麦隆­­­­ ­­加纳­­­­ ­塞拉利昂­­­­ ­中非共和国­­­­ ­几内亚­­­­ ­­­南苏丹­­­­ ­乍得­­­ ­ 几内亚比绍­­­­ ­苏丹­­­ ­­刚果共和国­­­­­ ­肯尼亚­­­­ ­多哥­­­­ ­­科特迪瓦­­­­ ­­利比里亚­­­­ ­乌干达­­­­ ­刚果民主共和国­­­­ ­马里中南美洲13个阿根廷­­­­ ­­巴拿马­­­­ ­玻利维亚­­­­ ­巴拉圭­­ ­­巴西­­­ ­­秘鲁­­­ ­­­哥伦比亚­­­­ ­苏里南­­­­ ­­厄瓜多尔­­­­ ­­­特立尼达和多巴哥­­­­ ­法属圭亚那­­­­ ­委内瑞拉­­­­ ­圭亚那­陕西国际旅行卫生保健中心(西安海关口岸门诊部)2024年7月24日
船员帮 2024-08-01
运价来到10000美元!全球第三大航运巨头上调海运价格
据承运商和进口商之间流传的价格,从亚洲运输货物的公司未来一个月需要为一个加急全尺寸集装箱支付高达1万美元,约为目前现货价格的两倍。总部位于法国马赛的全球第三大航运公司达飞集团(CMA CGM SA)已经宣布,6月下半月从亚洲运往北欧的货物为一个40英尺集装箱7000美元。这高于目前约5000美元的收费。6月上半月的价格在6000美元至6500美元之间,高级服务费用在7500至10000美元。货代视界,赞856由于红海在过去五个多月发生船只遇袭事件,导致运力捉襟见肘,集装箱航运业正在努力满足美国和欧洲日益增长的需求。“公司在改变库存策略,应对更长的交货时间,改变了正常的运输模式,”总部位于旧金山的物流技术公司Flexport的高级主管兼EMEA海洋业务负责人Trine Nielsen表示。“一些公司甚至重复下单或增加预订数量以确保仓位。”据彭博汇编的Freightos数据,在2021年9月,由于疫情相关需求激增,从中国运往美国西海岸的40尺集装箱现货价格飙升至2万美元以上。
船员帮 2024-06-02
“95后”海员的心声:海上漂泊的青春,孤独与激情并存!
“再不下船就要疯啦!”笑着说这句话的时候,26岁的小伙胡清池已经在海上漂泊了近11个月,船只预计5月10号晚在国内靠港,而他也将结束此次航行,回到阔别已久的陆地上。 “去年6月25号从青岛港出发前往巴西,这已经是第三个航次。以往我一般只跑两个航次,但疫情期间上船下船都没有那么方便,这次就坚持了三个航次。”胡清池说,作为一名海员,远洋航行本应是习以为常的事情,但疫情的特殊情况,无形中“拉长”了他的出海时间,让这11个月显得格外难熬。 这艘32.5万吨的散货船是胡清池大学毕业后服务的第三艘船,也是一艘新船,去年6月在青岛港正式下水起航。“去年上半年一直没等到合适的机会,直到6月份接到公司的通知,立马去做了核酸检测,然后赶到青岛上船,为航行做准备。”胡清池还清楚记得,新船起航那天,没有太多仪式,同事们只简单拍了个合影,作为纪念。从国内到巴西,单程一万两千余海里,对于胡清池来说,这是一个熟悉的航线,2018年大学毕业后,他一直跑的就是这条航线。去年下半年,他也是在这条船上,顺利通过了公司的考核,成为一名三副。船上的日常饮食相对比较清淡,逢年过节的时候,船上的大厨会给大家适当改善下伙食,一碗打卤面、一份炸鸡,这些陆地上的寻常饭菜,有时候在海上便成了“奢侈”。所以,每次上船之前,胡清池都会自己备上一些“重口味”的美食,放在自己的房间里,馋了的时候打打牙祭。“基本每次都会带火锅底料、辣条、各种麻辣口味的小零食,但每次不管带多少,好像最后都会不够吃。”船上的同事们来自五湖四海,虽然职务、学历都有区别,但胡清池觉得,这个20多人的小团队是个非常简单的队伍,大家共享同一片生活空间,各自忙碌也互相配合,生活简单纯粹。“我们这份职业没有固定的同事,每一次靠港,都会有人下船、有人上船,想遇到一位熟人不容易,但既然在同一条船上,大家也都很珍惜这份缘分。”胡清池说。“也许有人羡慕,觉得我们这份工作收入还不错,毕业两年多,就能拿到2万多的月薪,但其实,海员这个职业在收入方面的吸引力也在下降。”胡清池说,上个世纪90年代,海员月薪远远高于陆地上的普通职业工资水平,很多人选择到海上“捞金”。但现在,虽然整体也还不错,但和陆地职业相比优势已经不那么明显。“尤其是院校毕业的大学生,在陆地上也能找到一份还不错的工作,所以很多人觉得没必要来吃这份苦了。”在父母的眼里,胡清池的这份工作也有些让人“矛盾”。“一开始爸妈担心我在海上的安全,现在最多的是担心我找不到女朋友,担心将来成家了没时间好好照顾家庭……”胡清池说,他现在还不想给自己徒增烦恼,“还是要趁着年轻,多奋斗几年,将来才有更多的选择余地。”虽然算不上一个摄影爱好者,但胡清池的手机里还是存下了很多让他在海上“忍不住”拍下的美照,辽阔的大海、绚丽的晚霞、变幻的云层还有那天边不知名的鸟儿……“我们还偶遇过成群的海豚,见过近距离游过的鲨鱼,那情景,兴奋地只想大喊。”胡清池觉得,在这个最青春洋溢的年纪,能与这些美好的事物相遇,也不失为一种幸福。“一望无际的大洋里,你看到的,是最广阔的天和海,那个时候,心里什么都不想,也会有种热泪盈眶的冲动。”“每次休假时,走下舷梯的那个瞬间,是最让人开心的!”靠港的日子近在眼前了,胡清池难掩心中的兴奋,他已经规划好了,按照规定隔离结束后,他要好好理个发,然后大吃几顿,四处逛一逛,给自己的心灵放个假,好好踩一踩那久违的大地。
船员帮 2021-05-22
全国首批全港型引航员适任证书今颁发
记者从交通运输部海事局获悉,今天,浙江海事局向宁波舟山港7名引航员颁发了全国首批全港型引航员适任证书。此举彻底解决了宁波舟山港“一船两引”问题。宁波舟山港因行政区划、原跨港机构设置等原因,“一船两引”问题逐渐显现。因宁波舟山港原设有宁波和舟山两个引航站,引航范围按照行政区设各有分区,不能为航行靠泊宁波舟山港的船舶提供同一引航员全港域引航的服务,这一问题也不同程度影响了船舶航行安全和港口运行效率。今年3月,浙江海事局向交通运输部海事局申请试点开展宁波舟山港全港型引航员培训考试发证试点。获批后该局启动首批全港型引航员培养计划,并同步完成实操设施及考场场地的建设配备。6月27日,7名引航员经3个月见习培训后顺利通过全港型引航员考试评估,于28日获发适任证书,即日起具备宁波舟山港全港引航资格。
船员帮 2024-06-30
连云港海员开吧计划 5.6更新、海员培训
学校直招小证更新 5月10号,14号有班!(包换证)价格优惠,油化更新5月16号新版Mlc大厨证5月13号有班油化初培,T01  t02  T03  5月9号都有班小证初培,Z01  0708连续班5月9号02初培5月15号0708初陪5月15号通用G证 5月11号水手,机工全套包02和住宿体检。5月7号单独水手机工大证每月有班电子技工大证5月16日。三副三管(甲类,丙类,)5月9号班,包住宿,04 05,丁类三副三管,5月16号开班一年制三副三管(全日制大专学历以上)定期开班两年健康证,人来包过学校免费做海员证信息采集,不用跑海事局
船员帮 2024-05-06
澳洲PSC检查经验总结
本航次澳洲ABBOT POINT港口装煤炭回东莞,在国内开航去往澳洲的路上就开始提前做PSC的检查准备工作,尽量事无巨细,面面俱到,才能心底,从容应对。如我们所计划的那样,靠港第二天上午十一点一名检察官登轮,按照流程,我在梯口迎接了他,然后做好登记,拿好登轮牌,检查了他的背包,然后带进生活区。我们已经提前一按照检查清单把需要查看的文件和记录本拿好摆放在驾驶台海图桌上,船舶和船员证书放在船长房间,所以沟通以后直接先带到船长房间查看证书,然后再上驾驶台检查文件。到了房间,礼节性的招待和沟通以后正式开始检查,首先他告知了本次检查的流程和大约的时间,然后让在船头船尾提前准备两根皮龙,然后我告诉他已经提前准备就绪,救生艇也按照要求提前加好了保护装置,检察官看我们准备的很充分,给予了肯定。然后开始正常走流程,查看和登记船舶证书,重点检查了MLC相关的证书。然后在船员名单上面勾选了五名船员,让准备好适任证书和健康证,合格证,证书类检查完之后,检查了通导设备和消防救生设备的年度检验,然后检查了船级社的检验报告,重点检查了加强检验报告,检查结束表示没有问题,然后上驾驶台检查。到了驾驶台首先把清单上的剩余的文件记录本全部仔细检查了一遍,重点检查了油类记录本和垃圾记录本和演习记录并比对休息期间记录,确认是否如实记录。文件记录类全部检查完表示没有问题记录良好。然后开始正式对驾驶台设备检查,重点是电子海图的检查,调出回国的航线和检查所用海图是否更新,并考了二副几个问题,过程虽有磕碰,但最后还是得到认可,然后要求二副用DC电源进行对岸台的DSC测试,第一次测试没有回复,然后改了频率后测试得到回复,通过检查。随后进行SART和雷达的测试,航行灯,首楼进水报警,火警报警系统的测试,检查罗经误差等,几乎把驾驶台全部仔细过了一遍,得到认可通过检查。在出驾驶台之前,单独考了三副一个问题,询问DPA的名字和联系方式,联系方式背不出没有问题,能正确找到粘贴的号码位置给予认可。随后在船长,老轨,及所有驾驶员轮机员的陪同下,进行外部检查。首先在飞翼甲板要求启动应急消防泵,看皮龙出水压力表示满意,检查了MOB看到烟雾信号外壳局部被油漆污染,提出后面把它清洁掉,没有记录缺陷。随后到罗经甲板检查蘑菇头小通风筒,保养到位得到认可,检查VDR的电池和有效期等,最后提出部分挑战支架缺乏保养,船长及时解释由于害怕震动损坏天线,只能定期进行打磨刷漆保养,实在锈蚀严重的会直接更换支架,确认可以,没有记录缺陷。然后往下走到应急发电机间进行了断电启动测试,表示满意,但发现PPE箱子里面没有放洗眼液,口罩,眼镜等防护设备,态度诚恳的承认缺陷,马上拿了新的过来放好,给予认可,没有记录缺陷。随后进行了烟囱挡板的测试,一号风机的挡板测试,均没有问题。但是拍照记录了一条,由于本轮烟囱挡板是用小钢丝手动降落盖住上下通道,检查管认为不安全,提出如果这是正好有船员从楼梯上来,外部人员看不到里面,正好降落挡板会把人砸到,完成严重的伤害,我及时沟通,表示确实有这个风险,提出后期整改的建议,后面做两个警示标牌挂在上下通道口,此通道严禁用作进入机舱区域的通道,检查管表示这个方法可以,但是还是记录了下来。继续进行后面的检查,在没有进入一号艇内的情况下,要求用单电池启动一号艇,并进行了正倒车,和舵的测试,并检查了登乘梯及生根固定,护栏的高度检查等,表示满意。随后到二艇,并进入艇内,要求打开前后门,比对说明,检查脱钩装置,发现脱钩到位的绿色标记被橘色油漆覆盖,及时进行了整改,没有记录缺陷,检查了属具,食品,饮用水等,并考了艇长释放程序,没有要求启动艇机,随后表示结束,然后离开二号救生艇。在艇甲板休息了一会儿,要求打开检查全船的应急照明。随后到消防站检查,要求演示泡沫灭火系统的释放程序,检查消防员准备,测试钢瓶压力和低压报警等,表示满意。然后检查一楼公共区域的卫生,伙食库房,厨房的卫生,重点要求把油烟机滤网拆下来,检查内部是否有很多油泥,还好我们提前有进行清洁,表示很干净满意。随后考大厨厨房失火,你怎么处置,大厨不会英语,让他用手指出每一步的程序,在靠港之前专门安排三副对大厨进行了培训,勉强通过考核。随后检查了餐厅的卫生等,表示满意,然后检查甲板。按要求提前打开几个压载舱的透气帽,随后从前往后开始检查,检查了流水壶,舱盖背面的保养,百叶窗等,查看透气帽的浮盘,整体保养状况,由于裂缝等,检查下舱口道门的橡胶垫的水密情况等,表示满意。重点考核船员是否熟悉澳洲对引水梯的绑扎方法和要求,经过平时的多次练习,没有问题。随后检查油漆仓库,检查MSDS,个人防护设备,发现防护设备里面的口罩过期了,诚恳接受批评,立刻更换,没有记录缺陷。一路来到首楼甲板,查看锚缆机状况,刹车标志等,随后进入首楼仓库检查,提前做好卫生整理,当检查小污水井的时候,询问最近的一次测试,我们在路上提前进行了测试并展示了测试视频,对测试结果和库房的整洁卫生表示满意。随后返回到生活区进行机舱的检查。 领着检查官到机舱集控室,周围视查一下,测试了副机的漏油警报,要求到油水分离器旁检查及测试,三管将设备运行后,测试了15PPM警报及一二级分离腔排油电磁阀都在正常性能下,检查官询问处理水的回流漏斗(可视流装置)在哪?发生警报后,电磁阀没相应发生动作?本船设备型号USC-20,处理后干净水才能排出舷外,如果分离后油份浓度超过15ppm,探测装置动作发出警报,同时给污水泵个信号,泵自动停止。查看IOPP证书及说明书后,检查了油水分离器的舷外阀,接着用电筒检查主机前泵旁的舱底,污水井及斜坡后,检查了逃生孔及舱底水柜的自闭装置,查看了分油机间,围着主机转了一圈,检查了污水处理装置风泵的状况及投药筒,然后到NO1D.OSERV TK旁,进行油柜的速闭阀的试验,完成试验后,又检查了副机一圈,接着到了舵机房,试了应急舵及通信,全部通过,至此表示检查结束,返回准备写报告。随后回到船长房间,在出报告之前,船长要积极的和检查官沟通,表明对提出的小缺陷的整改的态度和措施,随后检察官发表了简短的总结,表示前两次澳洲PSC检查记录不好,本船目前处于高风险等级,本来是无法给清洁报告,但本次详细检查发现,船况较好,设备测试全部通过无故障,船员积极整改提出的问题,可以给予无缺陷报告, 随后通过邮件发给本船清洁报告,检查完美收官。
船员帮 2024-06-26
成绩作废!船员考试交头接耳、电子作弊, 被抓现行!提醒:对考场违纪说"NO"!
近期,多地顺利完成了一季度的船员考试。每年考试,都会出现船员考试作弊或不遵守考场纪律的情况。近日,媒体就报道了两起考生违反考场秩序的事件。第一起:考试中交头接耳屡教不改被赶出考场3月30日下午,镇江海事局组织开展海船船员考试。考试期间,一名参考人员因为多次无视考场纪律,被海事监考人员依规责令退出考场,并取消当科成绩。同时,该名考生还将因为其违反考场秩序的行为被列入信用“黄名单”管理。当天下午两点左右,镇江海事局组织开展“海船船员保安意识和负有指定保安职责培训合格证理论考试”。考前,每位考生都签订了《参培(考)人员信用承诺书》,并由海事监考人员宣读了考场纪律。但在考试中,考生王某某多次将头伸向其他正在考试的学员,交头接耳,不断讲话。经现场监考人员多次提醒并口头警告后,仍然不遵守船员考试考场秩序。见对方屡教不止,监考人员依照相关规定,当即责令考生退出考场,向其宣布本科目考试成绩作废的决定,在船员考试系统中取消本科目考试成绩,并将其带到张贴的船员考试考场规则面前进行教育学习。同时,依据《江苏海事监管领域信用管理规定》,该名考生还将因为其违反考场秩序的行为被列入信用“黄名单”管理,对个人征信产生影响。
船员帮 2023-04-14
恒力重工将拓展业务建造VLCC、LNG运输船、FPSO、超大型集装箱船
7月7日,大连市人民政府、长兴岛经济区管委会、恒力集团签署《恒力重工(大连长兴岛)产业园产业发展协议书》。辽宁省委常委、大连市委书记熊茂平,市委副书记、市长陈绍旺,市委常委、副市长刘恩举,长兴岛经济区党工委书记、管委会主任赵东,恒力集团董事长、总裁陈建华,总经理安锦香出席签约活动。根据协议,恒力集团将新增投资92亿元,建设恒力重工(大连长兴岛)产业园,预计形成年钢材加工量180万吨、年产量710万载重吨的建造能力,进一步拓展超大型油船(VLCC)、超大型液化气运输船、超大型集装箱船、海上浮式生产储油轮FPSO、海上浮式风电钻井平台等高附加值绿色船舶和高端海工装备制造业务,打造现代化、智能化、绿色化的一流船舶与海工装备制造产业基地。2022年7月,为贯彻落实国务院关于盘活存量资产、扩大有效投资的决策部署,同时积极响应各级党委政府的号召,恒力集团专门成立恒力重工集团,跨行业挺进船舶制造业,竞拍收购闲置十年之久的原STX(大连)资产,全力打造世界一流高端船舶建造基地,重点发展船舶建造、海洋工程、发动机、精密铸造等板块。去年初,恒力重工产业园全面运营,目前已提前交付船舶两艘,成为民营企业盘活存量资产、扩大有效投资的生动实践,也打造出了新时代东北振兴新的经济增长点。
船员帮 2024-07-09
江苏省港口集团成立新航运公司---江苏鸣海航运有限公司
近日,江苏鸣海航运有限公司正式挂牌成立,标志着江苏省港口集团在深化物流与航运板块融合上迈出关键一步,为创树“江苏物流”“江苏远洋”内外贸散货运输品牌奠定坚实基础。江苏省港口集团副总经理、党委委员唐文,生产业务部(总调度室)总经理施月亮应邀参加揭牌仪式。物流公司党委书记、董事长李锦和江苏远洋党委书记、董事长戴伟共同为鸣海公司揭牌。唐文指出,成立鸣海公司是集团推进散货水运自营体系建设和整合集团内部的散货水路运力,实现功能集聚、服务增值,进一步提升综合竞争力的重要一环,对提升物流板块货源吸聚力、区域辐射力,扩大航运板块市场份额具有重要意义。集团将继续加大支持力度,支持服务物流公司、江苏远洋散货自营业务发展壮大,促进多方合作共赢。双方要以此次合资合作为契机,持续加强协同联动和优势互补,优化业务模式,建强揽货体系,加强人才培育,共同做强做优做大集团散货水运自营业务。物流公司、江苏远洋相关领导及部门负责人,鸣海公司相关人员出席揭牌仪式。鸣海公司落户南京河西中央商务区,在股东双方成功“牵手”后,将依托股东方港航物流优势资源,全面推进江苏省港口集团散货水运自营体系建设。下一步,鸣海公司将开展国内沿海运输和省际船舶运输业务,并持续强化自有运力建设,扩大航运业务规模,打造经营服务集团枢纽能力提升的自有船舶运力、散货航线,促进港航物贸一体化、全程化发展,实现功能集聚、服务增值,不断提升综合竞争力,打造融合发展新样板,争创散货自营航线、班轮化运输新局面。
船员帮 2024-08-01
关注微信公众号



船员帮 帮船员

专为百万船员打造的一站式服务平台

 联系电话:13166192591
 传真:021-60719667
 邮箱:baoglyuhang@163.com
 地址:上海宝山区淞桥东路联合滨江大厦